By Riccardo Magini
Anyone who has worked with a planning ministry in a developing country knows the list. It sits in an annex to a national climate plan, with forty or fifty priority projects, grouped by sector, each with an indicative cost. The same projects appear in the Nationally Determined Contribution (NDC), the National Adaptation Plan and perhaps the Green Climate Fund (GCF) country programme. Some have concept notes and few have feasibility studies. Fewer still have an institution that has committed to taking them forward.
The problem is rarely a shortage of ideas. It is what happens to those ideas after they have been identified, but before they become projects someone can finance. This is the gap that one of COP31’s most interesting initiatives intends to close. And it raises a question that deserves more attention in Antalya: who is responsible for a climate project before anyone is prepared to fund it?
Antalya’s implementation promise
COP31 opens in Antalya on 9 November with an unusual division of responsibilities. Türkiye holds the presidency and leads the Action Agenda, while Australia’s Chris Bowen presides over the formal negotiations. The presidency has made implementation its central message. Countries have spent years defining climate commitments, establishing financing goals and preparing national plans. The priority now, it argues, is to turn those commitments into measurable results.
The Action Agenda sets out ten themes, including clean energy, climate-resilient cities, food security, green industrialisation and oceans. Several carry targets for 2035. But targets mean little unless governments can translate them into investments that reach communities, businesses and public infrastructure.
At the Pre-COP meetings in Tuvalu and Fiji this October, Pacific leaders made the urgency clear. Climate finance remains difficult to access, even for countries facing existential threats. The Taku Pakasoa Declaration calls for faster delivery, more accessible financing and greater use of grants and concessional resources, particularly for small island developing states and least developed countries.
Antalya’s proposed answer is the Climate Implementation Bridge, or BRIDGE. With the United Nations Development Programme as delivery partner, the initiative aims to connect national climate and development priorities with finance-ready project portfolios. Ethiopia, Fiji, Indonesia, Pakistan and Uzbekistan have been selected as the first five pilots. The intention is to identify implementation bottlenecks, strengthen national capacity and connect projects to existing sources of finance.
BRIDGE is an attempt to make existing institutions and financing mechanisms work together more effectively. The question is how far better coordination can help countries move projects from national plans towards implementation.
The orphan stage
Many climate projects pass through a period when nobody has fully assumed responsibility for developing them. Consider a national commitment to improve water security in drought-prone districts. The need is recognised, the climate rationale is clear and the intervention appears in the country’s adaptation priorities.
But what exactly is the project? Is it a new reservoir, a network of smaller storage facilities, rehabilitation of existing infrastructure or improvements to water management? Which institution will own the assets? Who will operate and maintain them? Can the responsible authority cover recurrent costs? And who will pay for the studies needed to decide which option makes sense?
A ministry responsible for climate policy may have identified the priority without having the mandate or resources to deliver it. The municipality or utility that could eventually operate the infrastructure may lack technical capacity or have competing investments. A potential financier needs more information before committing. The project is important to everyone, but not yet the responsibility of anyone in particular.
This is the orphan stage, and it is where many climate priorities lose momentum.
Assigning ownership does not resolve every obstacle. A responsible institution may still lack the capacity to implement a project, an affordable financing option or the resources to maintain the resulting assets. But without that institution, even excellent preparation work can lead nowhere.
This is particularly important for adaptation. A renewable energy project may have a developer and a potential revenue stream from an early stage. Coastal protection, flood management and urban resilience investments frequently depend on public institutions whose responsibilities, budgets and financing arrangements are less clearly defined.
In Osh, Kyrgyzstan, E Co. and Unison Group are supporting the municipality in developing its Green City Action Plan under the EBRD Green Cities programme. Following a technical assessment of the city’s environmental challenges, the process is moving into consultations with municipal departments, utilities and other stakeholders to define priorities and potential investments.
The plan is still being developed, but the process already makes one thing plain. Identifying what a city needs is only the beginning. and those priorities must eventually be connected to institutions capable of delivering and sustaining the investments. BRIDGE will need to address that same question at national scale.
Why project preparation is not enough
Project preparation is expensive, technically demanding and often difficult to finance. Before a climate priority becomes a credible investment, someone must assess the available options, establish feasibility, develop the climate rationale, assess environmental and social risks, structure the financing and demonstrate that the project can actually be implemented.
Much of this work happens before financing is secured. Its costs are immediate, while the benefits depend on a future investment that may never materialise.
Countries are not starting from zero. Multilateral development banks, development agencies and climate funds already offer project preparation support. The GCF’s Project Preparation Facility, for example, has approved 128 grants worth approximately USD 78.9 million, supporting accredited entities in developing funding proposals.
Although these facilities are crucial, it has not eliminated the gap between climate priorities and implementation. A preparation facility can finance technical studies. It cannot, by itself, resolve institutional disagreements, create fiscal space or guarantee that an implementing entity will take responsibility for the resulting project.
There are also practical difficulties with the way projects are prepared. A proposal designed for the GCF must satisfy its requirements. A development bank may need a different appraisal, while a commercial lender will ask different questions about revenues, risk and repayment. Countries can find themselves revisiting the same investment through multiple processes.
Smaller adaptation investments experience another problem. The cost of preparing and appraising a project does not necessarily fall in proportion to its size. Many potentially valuable local interventions become more attractive to financiers only when aggregated into larger programmes. This is why the quality of a pipeline depends on more than the number of projects it contains.
E Co’s work on climate investment planning and GCF country programming in Kyrgyzstan connects national priorities to a structured project pipeline and appropriate financing pathways. But even that connection is an intermediate step. A project becomes genuinely investable only when the institutional, technical and financial conditions for implementation come together. And preparation is not the end of the journey.
In Tuvalu, the GCF-funded Coastal Adaptation Project, approved in June 2016, completed was approved in June 2016 and completed its first phase only in December 2025. The coastal protection works visited by leaders ahead of COP31 are proof of what climate finance can build. They also show the years required to turn an approved investment into infrastructure on the ground.
That makes delays before approval all the more costly. Every year lost between an identified priority and a credible financing proposal adds to an implementation process that is already long.
Three shortages under one name
The premise behind BRIDGE is that considerable financing exists, but too few projects are ready to access it. That is only partly true. At least three distinct problems are often described as a shortage of climate finance.
The first is a shortage of prepared projects. Promising investments may lack feasibility studies, reliable data, appropriate financial structures or capable implementing institutions. Well-designed preparation support can make a substantial difference here.
The second is a shortage of fiscal space. A government facing severe debt constraints cannot necessarily borrow for a project simply because it is technically sound. Equally, a renewable energy project will not become financeable through better documentation if its main obstacle is a financially distressed utility that cannot meet its payment obligations.
The third is a shortage of suitable grant and concessional finance. Some climate investments deliver essential public benefits without generating sufficient financial returns. A sea wall may protect thousands of people and substantial economic activity, but that does not automatically create a revenue stream capable of repaying a commercial loan.
No feasibility study can remove that fundamental distinction. The LDC Group made the point forcefully in its September 2026 Dili Declaration, calling for substantially greater grant-based finance and expressing concern about debt burdens and the high cost of capital.
BRIDGE cannot solve all three problems through project preparation. Nor should it be expected to. Its contribution could be considerable if it helps countries distinguish between them rather than treating every financing difficulty as a lack of bankable projects.
That distinction should be built into the five pilots from the outset. Ethiopia, Fiji, Indonesia, Pakistan and Uzbekistan have different economic structures, institutional capacities and financing constraints. An approach designed for one may be inappropriate for another.
A useful Bridge initiative would make those differences visible and help direct each project towards the support and financing instrument it actually needs.
The test beyond BRIDGE
COP31’s proposed Green Industrialisation Facilitation Mechanism for Least Developed Countries faces a related challenge. The mechanism is expected to begin with ten pilot countries, connecting green industrial opportunities to technology, expertise, project development support and existing finance. Its initial focus is on projects that are already bankable or close to that stage.
This may produce early results, and demonstrating that coordinated support can accelerate investment would be worthwhile. However, it also raises these questions. If the first projects are already close to bankability, how much of their progress can be attributed to the new mechanism? More importantly, what happens to promising investments that are still several steps away?
The answer goes well beyond industrialisation. There is growing interest in mechanisms that coordinate existing resources rather than create new funds. Better coordination is necessary, especially in a financing system that countries often experience as fragmented and difficult to navigate.
Coordination, though, has limits. Connecting institutions cannot substitute for financing preparation, resolving implementation barriers or providing grants where investments cannot sustain debt. A platform full of promising ideas is still an inventory. A pipeline requires something more.
Four questions that should define success
When COP31 ends, BRIDGE will probably be able to report the number of countries participating, partnerships established and project opportunities identified. These are useful indicators of activity. They are not evidence that implementation has accelerated.
A functioning project pipeline has identifiable stages, accountable institutions, resources for preparation and a record of what happens to each investment as it progresses. Some projects advance, others change substantially, and some should be discontinued because the technical, economic or environmental case does not hold.
That last outcome is not necessarily a failure. Spending preparation resources to discover that a project should not proceed can prevent a much larger misallocation of public money. The real failure is losing track of projects without understanding why.
Ethiopia, one of the five pilots, hosts COP32 in November 2027. A year is too short for national climate plans to become operational infrastructure, but it is long enough for BRIDGE to answer four questions for each pilot country.
- Which projects have advanced to the next stage?
- Who is responsible for taking them forward?
- Who has financed their preparation?
- Which financing institution is actively engaged?
These questions are deliberately simple, but their answers would reveal much more than the number of projects entered into a database. They would show where institutional ownership is being established, where preparation resources are reaching viable priorities and where prospective financiers are becoming involved early enough to influence project design.
Countries should also be able to identify proposals that have stalled or been discontinued, and explain why. This would help distinguish genuine project-preparation constraints from problems of fiscal capacity, institutional responsibility or unsuitable financing terms. It would also give governments and development partners a clearer basis for deciding where additional support will have the greatest impact.
At the Pacific Pre-COP 31 in Fiji, the call to measure the time it takes for climate finance to reach communities rather than simply the volume approved captured the same concern. BRIDGE could help close the gap between those two measures and COP31 will be remembered as the ”Implementation COP.”