By Paula Brufman
In low-income countries, waste management takes nearly 20 per cent of municipal budgets on average and can be the single largest item a city pays for, according to the World Bank. That leaves cities with little to invest in new facilities. Türkiye has made zero waste one of the ten priority themes for COP31 and has set two related global goals for 2035.. One is to halve the projected growth in municipal solid waste, and the other is to raise the global circular material use rate to at least 15 per cent, from 6.9 per cent today. Neither goal comes with a plan to pay for the facilities that would deliver it.
Those facilities are transfer stations, sorting plants, composting sites, landfill gas systems and collection fleets, and nearly all of them belong to cities and municipal utilities. Local governments find climate finance harder to raise than almost any other public body. Unless countries group municipal projects into national programmes and back them with reliable revenue, Türkiye’s targets will be hard to meet.
Two goals that depend on cities
The two goals make up part of a wider zero waste priority in the presidency’s Action Agenda. It covers methane from waste, circular economy policies such as extended producer responsibility (EPR) and eco-design along with the infrastructure, investment and measurement, reporting, and verification (MRV) systems behind them, and food loss and waste. Türkiye has run a national Zero Waste programme since 2017, launched under the patronage of First Lady Emine Erdoğan.
UNEP’s Global Waste Management Outlook 2024 projects that municipal solid waste will rise from 2.1 billion tonnes in 2023 to 3.8 billion tonnes by 2050. Counting pollution, health and climate damage, waste management cost about USD 361 billion in 2020, and without urgent action, that bill could reach USD 640.3 billion a year by 2050. Halving waste growth will require cities to prevent it at source and manage it better.
Food waste is a major contributor to the problem. According to the World Bank, food and green waste account for 44 per cent of municipal waste worldwide. UNEP’s Food Waste Index Report 2024 estimated that 1.05 billion tonnes of food were wasted in 2022, equivalent to nearly a fifth of the food available to consumers. Households were responsible for 60 per cent of this waste. Food loss and waste generate 8 to 10 per cent of global greenhouse gas emissions, with decomposing food in landfills a major source of methane.
The circular economy goal is just as hard to reach. Circle Economy’s Circularity Gap Report 2025 found that only 6.9 per cent of the 106 billion tonnes of materials the world consumes each year comes from recycled sources, and that share has fallen since 2018. Raising it to 15 per cent requires large volumes of clean, well-sorted secondary materials, and that supply starts with household collection. The Climate Policy Initiative (CPI) estimates that more than 70 per cent of solid waste management falls under municipal jurisdiction, so both goals depend on the same local authorities.
Why waste projects struggle to reach approval
The waste sector produces about 20 per cent of human-caused methane emissions, and those emissions are projected to double by 2050 without urgent action. CPI found that solid waste methane abatement received about USD 4 billion in 2022, compared with an estimated USD 12 billion needed each year. Organic waste management, including composting, received only USD 22 million of tracked climate finance that year. Only 6 per cent of tracked solid waste funding went to proven methane solutions such as landfill gas capture and anaerobic digestion of food waste, and most of the rest went to incineration, even though 60 per cent of methane abatement measures in the sector are low-cost or cost-negative.
In our work across Green Climate Fund (GCF) and Global Environment Facility project cycles, we see three common reasons waste proposals fail to reach approval.
Scale comes first. A composting plant or transfer station in a mid-sized city is a modest investment. However, it still carries the full cost of feasibility studies, environmental and social safeguards, procurement, and the MRV of emissions. Funds looking for scale rarely approve a single municipal site on its own.
Municipal finances create a second problem. CPI estimates that waste management takes 20 to 50 per cent of municipal budgets in emerging and developing economies, and few municipalities have the credit rating or legal authority to borrow on their own account.
The hardest question for reviewers concerns revenue. They want to know who will pay to run a facility once the grant is spent, and often nobody can answer. Fees are set below cost, collected from a minority of households, or not charged at all. Funders can usually find capital for a well-designed plant, but they are reluctant to back an asset that will be short of operating money from its first year.
Group the cities into one programme
Countries can get around the problem of scale by presenting waste projects as national programmes instead of single-city proposals. A national programme can bring dozens of municipal sub-projects under a single financing envelope with shared eligibility criteria, managed by an accredited or executing entity such as a national development bank or municipal fund.
Latin America already has models to follow. In 2014, the Inter-American Development Bank approved a USD 150 million loan for Argentina’s Integrated Urban Solid Waste Management Program, designed to improve collection and disposal for about 975,000 households in urban and tourist centres. In 2023, the European Investment Bank signed a EUR 40 million framework loan for Argentina. It covers collection, treatment, disposal and dumpsite rehabilitation across several provinces, in a programme costing around EUR 165 million. Brazil’s 2010 National Solid Waste Policy gives municipalities that form intermunicipal consortia priority access to federal funding. Its 2020 sanitation framework went further, allowing groups of municipalities to hire a single service provider through one tender, spreading costs and making services viable in smaller towns.
Grouping projects saves money in several ways. Standard designs for transfer stations, composting, or landfill gas capture lower preparation costs, and a single MRV system for methane makes results comparable across cities. A pooled vehicle can also borrow on better terms than most of its member cities. It can take concessional money in the form the GCF and GEF prefer, a programme with further tranches in the pipeline.
Revenue that lasts after the grant
Funders also need to see how a waste system will be paid for once it is built. Concessional finance can cover capital investment, and recurring income must cover operations.
Fees are the starting point, and they have to be collected. A 2020 index by PwC Brazil and the national union of urban cleaning companies found that only 41.5 per cent of Brazilian municipalities charged a waste fee or tariff, and almost half still used open dumps. Brazil’s sanitation framework (Law 14.026) gave municipalities 12 months to propose a charging instrument for waste services. A municipality that missed the deadline would be treated as waiving revenue, which Brazilian law penalises unless the loss is offset elsewhere or built into budget forecasts. Collection rates improve when the waste fee is added to a water or electricity bill that households already pay. Fees also need to stay affordable, and the World Bank uses about 1 per cent of average household income as a working threshold. Charging businesses more can help subsidise poorer households.
EPR and deposit return schemes move part of the cost of packaging waste from city budgets to the companies that put it on the market, and they give those companies a reason to design packaging that is easier to reuse or recycle. Türkiye launched a nationwide deposit return system in July 2026, as part of its plan to reach an 80 per cent recycling rate by 2053.
Carbon revenue can help at the margin. Verified methane reductions from landfill gas capture or from diverting organic waste can earn carbon credits or results-based payments. They rarely cover the full cost of a system, but they can make up part of the difference between what fees raise and what operations cost.
Waste fees are unpopular, and enforcement is weakest where it is most needed. Fee reform therefore belongs inside programme design, supported by readiness funding and technical assistance, instead of being left as a condition each municipality must meet on its own.
Three outcomes for waste finance at COP31
President-designate Murat Kurum has named the obstacles himself. He pointed to difficulties accessing finance, capacity shortages, and the need to connect technology and investment with local needs. The Climate Implementation Bridge, which Türkiye developed with UNDP, the OECD and the World Meteorological Organization, aims to turn national climate plans into investable projects, and municipal waste would be a strong early candidate for it.
Agreements in Antalya could give the 2035 goals a route to delivery. Countries could commit to national waste investment programmes instead of lists of individual city projects, and include them in their Nationally Determined Contributions (NDCs) alongside waste methane targets. It would also help if climate funds opened a clear programmatic route for municipal waste, with readiness and project preparation support aimed at the national development banks, municipal funds and intermunicipal consortia that can pool demand. Each financed programme should then come with a revenue plan, using fee reform, EPR or results-based payments, that shows how the assets will be operated and maintained after construction.
How E Co. supports waste investment
E Co. has designed waste programmes with national governments, UN agencies and cities in several regions. In Uganda, we developed the project document and CEO Endorsement Request for UNDP’s GEF-funded NAMA on Integrated Waste Management and Biogas. It covered four cities, Kampala, Jinja, Mbarara and Mbale, and included business models for the treatment and biogas plants and standardised baselines for MRV. In Brazil, we worked on UNIDO’s GCF concept note for a national programme to cut emissions from municipal solid waste, designed to support the National Solid Waste Plan across the country’s municipal waste sector.